summaryrefslogtreecommitdiff
path: root/docs/hardware/COMPONENT_HW_MAP.md
diff options
context:
space:
mode:
Diffstat (limited to 'docs/hardware/COMPONENT_HW_MAP.md')
-rw-r--r--docs/hardware/COMPONENT_HW_MAP.md7
1 files changed, 6 insertions, 1 deletions
diff --git a/docs/hardware/COMPONENT_HW_MAP.md b/docs/hardware/COMPONENT_HW_MAP.md
index ff47123..0cae1ea 100644
--- a/docs/hardware/COMPONENT_HW_MAP.md
+++ b/docs/hardware/COMPONENT_HW_MAP.md
@@ -48,7 +48,12 @@ Companion docs: `HW_RESEARCH_FINDINGS.md` (softmax dossier, OLMo2 analog audit,
## D. Demo scoping (reuse-doctrine currency)
-- **Demo-0 (spec target of E-tier):** single cascade block, SRAM-CIM eval module + FPGA harness +
+- **⚡ 2026-07-12: Demo-0 SUPERSEDED as the first rung by CLOCKLESS_ANALOG_MVP_PLAN.md**
+ (user-authored): a $170–300 clockless twin-network tile (Dillavou-lineage; EP current-nudge vs CL
+ voltage-clamp; exact vs sign local update; no processor/converter/clock in the learning loop)
+ validates the physical learning primitive first. The CIM block below becomes the PARTNER rung
+ (rung 5 of the ladder in COLLABORATOR_BRIEF.md).
+- **Demo-0 (now rung 5, partner phase):** single cascade block, SRAM-CIM eval module + FPGA harness +
COTS mixer/DAC/ADC periphery; goal = demonstrate the two-phase θ-read on one block with measured
tolerances. Board-BOM class: $5–20k.
- **Demo-1:** time-multiplex ONE physical trainable block through L logical positions (cascade's