summaryrefslogtreecommitdiff
path: root/docs
diff options
context:
space:
mode:
Diffstat (limited to 'docs')
-rw-r--r--docs/campaign/CASCADE_ABLATION_PLAN.md16
1 files changed, 16 insertions, 0 deletions
diff --git a/docs/campaign/CASCADE_ABLATION_PLAN.md b/docs/campaign/CASCADE_ABLATION_PLAN.md
index f919db1..f3678b3 100644
--- a/docs/campaign/CASCADE_ABLATION_PLAN.md
+++ b/docs/campaign/CASCADE_ABLATION_PLAN.md
@@ -568,6 +568,22 @@ direction), not training-under-fault; wave-2 = co-training with faults injected
+### RESULT 72 (2026-07-29): THE CURVE GOES ALL THE WAY — dg128 closes 97% (tail within
+0.0015 of the all-BP bar); the physics leak is FULLY REDEEMABLE by displacement amplification.
+FULL-DOSE VALIDATION LAUNCHED.
+Battery 8: dg64 92%, dg128 97% (log-law held the whole way: 34/50/63/75/92/97 at x4..x128),
+dgrand64 64% (spread-spectrum loses to fixed dose — the value lives in the high octaves;
+log-uniform wastes steps low). dg128 mechanics: r18/6k mild, no skips, drift 0.009; gn 5.07
+(amplified-read apparent norm — clip + msign both immune); cos 0.28 with BP-equivalent CE —
+the direction-metric coffin nailed shut.
+STANDING QUESTION (the honest one for the ladder): does the required dose scale with width?
+x128 at C768 vs ~x1 at C512 — if dose ~ width^k the wall is soft but real; if it saturates,
+this is a cure. 270M will answer. Production note: dgain is estimator-side only — model,
+inference, cost, hardware story all untouched; hardware realization = per-layer nudge
+amplifier gain (standard analog practice).
+IN FLIGHT: fw135m_dg128 (bsign + dgain_top 128, s250000 -> 440k, 3-GPU, ~22h). Bars:
+untreated 3.3839 | BP 3.0902. Success = endpoint ~3.15-3.18, gap back in the 72M band.
+
### RESULT 71 (2026-07-29): DOSE CURVE — logarithmic recovery (34/50/63% at x4/8/16),
DISPLACEMENT-EQUIVALENCE LAW triple-confirmed, cos retired as a metric; TREATMENT VALIDATION
LAUNCHED (bsign + dg8top, full remaining segment).