| Age | Commit message (Expand) | Author |
|---|---|---|
| 2026-07-09 | notes refresh: plan status stamp (K1-K3 sealed, D-tier in flight), ONBOARDING... | Yuren Hao |
| 2026-07-09 | cascade: retire zil per user directive (EP route = equilibrium two-phase); pr... | Yuren Hao |
| 2026-07-09 | cascade: zil interleaved scheme = exact gradients at all depths (cos 1.0000 L... | Yuren Hao |
| 2026-07-09 | cascade ablation program: plan doc (5 claims, tiers 0-4), probe v2 (jacobi/gs... | Yuren Hao |
