| Age | Commit message (Collapse) | Author | |
|---|---|---|---|
| 2026-07-12 | Hardware outreach v2: gate lifted, clockless-MVP story, Dillavou wave-1, ↵ | Yuren Hao | |
| brief rewritten to cascade-era Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_014FAPDWQ49M5Ye3NpTndTpn | |||
| 2026-07-12 | E-tier wave-1 ledger (RESULT 14 + HW map rows) + cost model v2 recalibrated ↵ | Yuren Hao | |
| on measured H200 datapoint Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_014FAPDWQ49M5Ye3NpTndTpn | |||
| 2026-07-11 | Component->analog-hardware map: full stack (forward path A.1-10, training ↵ | Yuren Hao | |
| machinery B.11-17, cross-cutting physics C, demo scoping D) with reuse sources, feedback-path costs, tolerance status per item | |||
