summaryrefslogtreecommitdiff
path: root/notes/41_paper_plan.md
AgeCommit message (Collapse)Author
2 daysAdd AAAI depth experiments and diagnostic figuresYurenHao0426
2026-06-13Add master technical reference; retire unverified e0 headlineYurenHao0426
Note 42 is a self-contained write-from document: full statements and proofs for Thm 1-4 / Prop 1-3 / Cor 1-2, every result with exact numbers and configs cross-checked against the CSVs, the negative results, and the honesty boundaries. Audit finding while building it: the "E_B[e0]=0.4378 +/- 0.008 vs 0.4403" headline (cited in notes 29/35/36/40/41 and the old draft) is not reproducible from the current moments CSV. Retired in favor of the reproducible 6x6 table (max |error| <= 0.008, predicted span 0.15-0.45). Living docs updated; note 37 sec 4 records the retirement. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-06-13Add prose style contract for the writing passYurenHao0426
Adapt the flossing project's anti-slop checklist to facap: keep the general layers (lexical bans, em-dash budget, density floor, Buschek integrity mapping) and replace the project-specific honesty rails with facap's (retired 0.977, no-fit definition, estimator scope, hard-k as null model only, inline assumptions, MNIST MAE-first, teacher gap as scoping evidence). Note 41 section 7 and the schedule now point at it. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-06-09Organize repo and add AAAI-27 writing planYurenHao0426
Root README orients the repo; notes/README reindexed by status (writing pipeline / authoritative note per result / six historical phases with superseded markers); scripts/README gains a status table. Note 40 = reproduction manifest (claim -> command -> outputs -> note; everything unlisted is not citable). Note 41 = the binding paper plan: AAAI-27 constraints (7pp + refs, appendix not guaranteed read), narrative, section/page budget, frozen theorem and figure numbering, related-work list with per-cite rationale, writing rules, weekly schedule to the 07-20/07-27 deadlines, and risk register. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>