From e65dd2e2460b1da48c83a930304cf9b269fc4447 Mon Sep 17 00:00:00 2001 From: YurenHao0426 Date: Mon, 27 Jul 2026 17:47:13 -0500 Subject: Add AAAI depth experiments and diagnostic figures --- notes/README.md | 6 ++++++ 1 file changed, 6 insertions(+) (limited to 'notes/README.md') diff --git a/notes/README.md b/notes/README.md index 853c122..021b966 100644 --- a/notes/README.md +++ b/notes/README.md @@ -7,6 +7,7 @@ capacity & operator-gap analysis)** — target AAAI-27. | doc | role | |---|---| +| [43_aaai_accept_bar_experiments.md](43_aaai_accept_bar_experiments.md) | **new focused-paper experiments**: FA/DFA depth calibration, finite-time depth grid, learning-rate controls, CE CNN validation, and two composite figures | | [42_master_technical_reference.md](42_master_technical_reference.md) | **write the paper from this**: every theorem with full statement + proof, every result with exact numbers/configs, derivations, negative results, honesty boundaries -- self-contained | | [41_paper_plan.md](41_paper_plan.md) | **the plan**: venue rules, narrative, section/page budget, theorem & figure numbering, related-work list, schedule, risks | | [36_evidence_ledger.md](36_evidence_ledger.md) | **the numbers, condensed**: every claim with its corrected headline figure, claim discipline, booby traps | @@ -73,6 +74,11 @@ Phase 6 — wrap-up for AAAI-27 (2026-06-09..13): test gap**; 40 reproduction manifest; 41 paper plan; 42 **master technical reference** (full proofs + numbers, the write-from doc). +Phase 7 — focused accept-bar controls (2026-07-21): +- 43 **FA/DFA depth calibration, FA finite-time depth/width grid, learning-rate + compensation and independent tuning, cross-entropy CNN initialization + validation, and focused Figures 1-2**. + ## Note conventions - Prefer formulas and precise claims over prose-only ideas. -- cgit v1.2.3