summaryrefslogtreecommitdiff
AgeCommit message (Expand)Author
10 daysfigure: visualize dynamic innovation stability repairYurenHao0426
10 daysaudit: include dynamic projection gates in finalizerYurenHao0426
10 daysdocs: record dynamic projection stability and short passYurenHao0426
10 daysprotocol: implement frozen dynamic projection full gateYurenHao0426
10 daysresults: pass dynamic projection short validationYurenHao0426
10 daysprotocol: freeze dynamic projection validation gatesYurenHao0426
10 daysexperiment: support audited dynamic projection endpointsYurenHao0426
10 daysresults: pass dynamic projection training gateYurenHao0426
10 daysprotocol: freeze dynamic projection training gateYurenHao0426
10 daysexperiment: add dynamic neutral residual projectionYurenHao0426
10 daysdocs: close one-sided stability branchYurenHao0426
10 daystheory: bound both sides of residual stabilityYurenHao0426
10 daysresults: close stability-margin training screenYurenHao0426
10 daysdiagnostic: record pre-grid stability candidatesYurenHao0426
10 daysprotocol: freeze stability-margin training screenYurenHao0426
10 daysexperiment: add one-sided residual stability marginYurenHao0426
10 daysexperiment: freeze predictor after neutral fitYurenHao0426
10 daysexperiment: add closed-form neutral innovation fitYurenHao0426
10 daysdocs: explain mixed-traffic instabilityYurenHao0426
10 daystheory: expose residual coupling instabilityYurenHao0426
10 daysdiagnostic: record mixed-traffic failure onsetYurenHao0426
10 daysdiagnostic: distinguish RMS overflow from active failureYurenHao0426
10 daysdiagnostic: separate training-active nonfinite stateYurenHao0426
10 daysdiagnostic: localize mixed-traffic nonfinite onsetYurenHao0426
10 daysdocs: close mixed-traffic path after short failureYurenHao0426
10 daysresults: record mixed-traffic short failureYurenHao0426
10 daysdocs: record reciprocal KP full passYurenHao0426
10 daysresults: pass reciprocal KP full gateYurenHao0426
10 daysaudit: require finite mixed-traffic diagnosticsYurenHao0426
10 daysaudit: reject nonfinite confirmation trajectoriesYurenHao0426
10 daystest: regenerate audited tracking supplementYurenHao0426
10 daysaudit: manifest tracking failure figure sourcesYurenHao0426
10 daysfigure: visualize endpoint tracking failureYurenHao0426
10 daysaudit: enforce paired task order after neutral warmupYurenHao0426
10 daystheory: formalize reciprocal KP tracking dynamicsYurenHao0426
10 daysaudit: conservatively count predictor arithmeticYurenHao0426
10 daysfix: release mixed-traffic warmup cachesYurenHao0426
10 daysdocs: constrain post-A3 accept recovery claimYurenHao0426
10 daysresults: pass mixed-traffic mechanics gateYurenHao0426
10 daysaudit: align mixed-traffic compute with cost ledgerYurenHao0426
10 daysresults: record residual mirror full failureYurenHao0426
10 daystest: include ResNet innovation mechanics in accept auditYurenHao0426
10 daystheory: preregister mixed-traffic signal predictionYurenHao0426
10 daysdocs: register mixed-traffic accept pathYurenHao0426
10 daysprotocol: implement untouched innovation confirmation gateYurenHao0426
10 daysprotocol: implement mixed-traffic full validation gateYurenHao0426
10 daysexperiment: implement KP mixed-traffic innovation controlsYurenHao0426
10 daysprotocol: freeze KP mixed-traffic innovation gatesYurenHao0426
10 daystheory: expose intermittent feedback tracking lagYurenHao0426
10 daysprotocol: implement reciprocal KP full gateYurenHao0426