index
:
sdil.git
main
Unnamed repository; edit this file 'description' to name the repository.
Ubuntu
summary
refs
log
tree
commit
diff
log msg
author
committer
range
path:
root
/
experiments
Age
Commit message (
Collapse
)
Author
9 days
bci: add endpoint-free oral-B-v2 mechanics
YurenHao0426
9 days
paper: add evidence-bound ICLR manuscript draft
YurenHao0426
9 days
figures: add audited ResNet confirmation panel
YurenHao0426
9 days
audit: bind D4 to frozen source revision
YurenHao0426
9 days
audit: bind scale evidence to authorized GPUs
YurenHao0426
9 days
test: falsify oral B protocol boundaries
YurenHao0426
9 days
test: falsify oral A recovery boundaries
YurenHao0426
9 days
protocol: freeze dynamic standard-depth recovery
YurenHao0426
9 days
audit: make oral B development gate immutable
YurenHao0426
9 days
audit: conditionally recheck future gates
YurenHao0426
9 days
protocol: freeze oral B recovery confirmation
YurenHao0426
9 days
audit: make D4 confirmation gate immutable
YurenHao0426
9 days
audit: bind oral B recovery to D4 gate
YurenHao0426
9 days
test: verify temporal plasticity lesion boundary
YurenHao0426
9 days
audit: include oral B mechanics in finalizer
YurenHao0426
9 days
protocol: freeze D4-gated oral B recovery
YurenHao0426
9 days
audit: isolate BCI role learner from environment map
YurenHao0426
9 days
mechanism: separate BCI role from performance velocity
YurenHao0426
9 days
docs: promote full dynamic ResNet result
YurenHao0426
9 days
protocol: freeze paired dynamic confirmation
YurenHao0426
9 days
docs: add audited dynamic stability caption
YurenHao0426
9 days
theory: verify dynamic neutral projection stability
YurenHao0426
9 days
audit: regenerate dynamic stability figure
YurenHao0426
9 days
figure: visualize dynamic innovation stability repair
YurenHao0426
9 days
audit: include dynamic projection gates in finalizer
YurenHao0426
9 days
protocol: implement frozen dynamic projection full gate
YurenHao0426
9 days
protocol: freeze dynamic projection validation gates
YurenHao0426
9 days
experiment: support audited dynamic projection endpoints
YurenHao0426
9 days
protocol: freeze dynamic projection training gate
YurenHao0426
9 days
experiment: add dynamic neutral residual projection
YurenHao0426
9 days
theory: bound both sides of residual stability
YurenHao0426
9 days
protocol: freeze stability-margin training screen
YurenHao0426
9 days
experiment: add one-sided residual stability margin
YurenHao0426
9 days
experiment: freeze predictor after neutral fit
YurenHao0426
9 days
experiment: add closed-form neutral innovation fit
YurenHao0426
9 days
theory: expose residual coupling instability
YurenHao0426
9 days
diagnostic: distinguish RMS overflow from active failure
YurenHao0426
9 days
diagnostic: separate training-active nonfinite state
YurenHao0426
9 days
diagnostic: localize mixed-traffic nonfinite onset
YurenHao0426
9 days
audit: require finite mixed-traffic diagnostics
YurenHao0426
9 days
audit: reject nonfinite confirmation trajectories
YurenHao0426
9 days
test: regenerate audited tracking supplement
YurenHao0426
9 days
audit: manifest tracking failure figure sources
YurenHao0426
9 days
figure: visualize endpoint tracking failure
YurenHao0426
9 days
audit: enforce paired task order after neutral warmup
YurenHao0426
9 days
theory: formalize reciprocal KP tracking dynamics
YurenHao0426
9 days
audit: conservatively count predictor arithmetic
YurenHao0426
9 days
fix: release mixed-traffic warmup caches
YurenHao0426
9 days
test: include ResNet innovation mechanics in accept audit
YurenHao0426
9 days
protocol: implement untouched innovation confirmation gate
YurenHao0426
[next]