summaryrefslogtreecommitdiff
diff options
context:
space:
mode:
-rw-r--r--hw_sim/NOTES.md11
1 files changed, 11 insertions, 0 deletions
diff --git a/hw_sim/NOTES.md b/hw_sim/NOTES.md
index eee68c6..70cf1e6 100644
--- a/hw_sim/NOTES.md
+++ b/hw_sim/NOTES.md
@@ -84,3 +84,14 @@ HONEST CONCLUSIONS:
fabric at all (inference-only CIM can't train; digital training is the displaced baseline).
4. Method: analog side SPICE-measured (+-2-3x wiring band), digital side literature constants
(Horowitz/H100 envelope) — the standard comparison protocol, uncertainty stated.
+
+## FAB STRATEGY (plan of record, 2026-07-18, user-aligned)
+JLC PCB + SMT assembly for everything; SOCKET the screened gray-market MDACs (DIP/PLCC sockets)
+— machine quality + swappability/debuggability for the risky parts. Design-for-test in layout:
+test points, jumpers, isolatable single-column bring-up region (first board runs Stage-1 gates
+on one column). First-article batch of 5 before volume. Hand-soldering is not an option at T64
+scale (2,250 x 20 pins); even the $300 MVP goes JLC economy so identical boards can ship to
+Dillavou/Sam. Toolchain endpoint: SKiDL -> KiCad -> scripted Gerber+BOM+CPL = JLC-ready order
+package from the same simulated source. SPICE pre-verification (v0/v1/v1.1/Stage-C) exists to
+hold respins to 1-2 x 1-2 weeks. Bonus: machine-assembled layout parasitics are REPRODUCIBLE,
+narrowing the 1-3x wiring band in the settle/energy ledgers.