summaryrefslogtreecommitdiff
path: root/docs/campaign/CASCADE_ABLATION_PLAN.md
diff options
context:
space:
mode:
Diffstat (limited to 'docs/campaign/CASCADE_ABLATION_PLAN.md')
-rw-r--r--docs/campaign/CASCADE_ABLATION_PLAN.md10
1 files changed, 10 insertions, 0 deletions
diff --git a/docs/campaign/CASCADE_ABLATION_PLAN.md b/docs/campaign/CASCADE_ABLATION_PLAN.md
index f3678b3..8d0ed5c 100644
--- a/docs/campaign/CASCADE_ABLATION_PLAN.md
+++ b/docs/campaign/CASCADE_ABLATION_PLAN.md
@@ -568,6 +568,16 @@ direction), not training-under-fault; wave-2 = co-training with faults injected
+### QUEUED (2026-07-29, user design): WIDTH MINI-LADDER — scale DOWN to extrapolate UP.
+New FineWeb rungs below the existing pair: C256 (~27M, 0.53B tok) + C384 (~46M, 0.93B tok),
+L12/hd64, Chinchilla-matched, EP(bsign)+BP twins; plus the leak instrument AT C512 (existing
+fw72m_bsign_s190000: dgain dose {1,4,16} + allbp bar). Four-point deliverables:
+gap(width) and dose*(width). Key discriminator: C512->C768 dose jumped x1 -> x128 — smooth
+power law (dose ~ width^k -> soft wall, budget k for 270M) vs width THRESHOLD near C600
+(leak absent below -> different physics, sharper story). Also quantifies whether the 72M
+0.076 gap hides a small closable leak (lk512 arms answer directly). Chained behind fw135m_dg128
+on all three GPUs; ~12h of ladder after the validation completes.
+
### RESULT 72 (2026-07-29): THE CURVE GOES ALL THE WAY — dg128 closes 97% (tail within
0.0015 of the all-BP bar); the physics leak is FULLY REDEEMABLE by displacement amplification.
FULL-DOSE VALIDATION LAUNCHED.