| Age | Commit message (Expand) | Author |
| 2026-07-10 | Sustained dose-response sealed (3e-4/5e-4/1e-3 -> 0.975/0.983/0.990); ship --... | Yuren Hao |
| 2026-07-10 | RESULT 8 sealed (Muon 3v3: BP 1.7098 / EP 1.7314); beta-floor dose-response @... | Yuren Hao |
| 2026-07-10 | Watch: late-epoch cos erosion = intrinsic late-training SNR decline; let it r... | Yuren Hao |
| 2026-07-10 | RESULT 8 final: Muon generic (+0.13 both columns; BP+Muon 1.7020 vs EP+Muon 1... | Yuren Hao |
| 2026-07-10 | RESULT 9: wall-2 ELIMINATED by OLMo2 arch — epoch cleared 10-14k with zero ... | Yuren Hao |
| 2026-07-10 | RESULT 8 prelim: Muon+beta_floor on EP = 1.7316 (-0.098 vs AdamW, n=1, zero s... | Yuren Hao |
| 2026-07-10 | RESULT 7: OLMo2 parity PASS (BP 1.8335 vs EP 1.8643, gap +0.031 within metric... | Yuren Hao |
| 2026-07-10 | RESULT 6 addendum: K8 also blew at 12600 -> wall-2 is true contractivity cros... | Yuren Hao |
| 2026-07-10 | RESULT 6: wall-2 = EP-specific marginal under-convergence at the contractivit... | Yuren Hao |
| 2026-07-10 | AUDIT: retract confounded Muon verdict; tone down parity claims (n=3, best-of... | Yuren Hao |
| 2026-07-10 | Stage-1 epoch blowup @12100: sig story REFUTED (only +8%, cos fine till after... | Yuren Hao |
| 2026-07-10 | RESULT 4: QK-norm validated parity-preserving (EP 1.8868 <= BP 1.9066); qk_no... | Yuren Hao |
| 2026-07-10 | QK-norm: replace nn.MHA with explicit SDPA attn + --qk_norm (OLMo2-style, ana... | Yuren Hao |
| 2026-07-10 | RESULT 3: K4 depth-parity SEALED EP-favorable (EP 1.8907 <= BP 1.9192 @ L12xC... | Yuren Hao |
| 2026-07-10 | CORRECTION: D1a did not die (misread mangled proc scan); originals completed ... | Yuren Hao |
| 2026-07-10 | RESULT 2: beta-floor confirmed as L12 depth fix (3e-4 holds cos=1.0 vs contro... | Yuren Hao |
| 2026-07-10 | K refuted as L12 lever (cos K-invariant K3==K8); BP 3-seed sealed 1.919; mech... | Yuren Hao |
| 2026-07-09 | D1a autopsy + K-ladder diagnostic: parent-death (not nohup'd) killed 4 arms; ... | Yuren Hao |
| 2026-07-09 | notes refresh: plan status stamp (K1-K3 sealed, D-tier in flight), ONBOARDING... | Yuren Hao |
| 2026-07-09 | cascade: retire zil per user directive (EP route = equilibrium two-phase); pr... | Yuren Hao |
| 2026-07-09 | cascade: zil interleaved scheme = exact gradients at all depths (cos 1.0000 L... | Yuren Hao |
| 2026-07-09 | cascade ablation program: plan doc (5 claims, tiers 0-4), probe v2 (jacobi/gs... | Yuren Hao |