summaryrefslogtreecommitdiff
path: root/ROADMAP.md
diff options
context:
space:
mode:
authorYurenHao0426 <Blackhao0426@gmail.com>2026-07-22 16:06:47 -0500
committerYurenHao0426 <Blackhao0426@gmail.com>2026-07-22 16:06:47 -0500
commit412314e3ed7bca666a41876980b479456f5e733d (patch)
tree7a0fc53a07f36debd523a0f09e889c7fb154cb6d /ROADMAP.md
parent2ef7f94291c35a284394bf0dd2f0c452c89847a0 (diff)
docs: record reciprocal KP full pass
Diffstat (limited to 'ROADMAP.md')
-rw-r--r--ROADMAP.md14
1 files changed, 11 insertions, 3 deletions
diff --git a/ROADMAP.md b/ROADMAP.md
index 68e1b92..1bf6e32 100644
--- a/ROADMAP.md
+++ b/ROADMAP.md
@@ -455,8 +455,8 @@ cosine `0.999998`, and norm ratios `[1.0002,1.0024]`. This closes RRM without
cadence/rate rescue and demonstrates why endpoint cosine cannot substitute for
a training-trajectory audit. No innovation or test panel opens from RRM.
-**Modified Kolen--Pollack baseline protocol: mechanics passed, task gate
-frozen.** The separate local reciprocal correlations, post-observation W/Q
+**Modified Kolen--Pollack baseline protocol: mechanics and both task gates
+passed.** The separate local reciprocal correlations, post-observation W/Q
independence, and exact symmetric-limit momentum updates all pass at zero
numerical error. `KP_BASELINE.md` freezes one 20-epoch full-development screen
with no LR/decay grid and requires both validation accuracy and training-period
@@ -473,6 +473,14 @@ the frozen settings. This strongly repairs the feedback-substrate engineering
problem but remains inherited Akrout et al. evidence, so the paper score stays
5/10.
+**Modified Kolen--Pollack KP-2 status: passed.** The sole frozen 200-epoch
+record reaches `91.26%` validation accuracy versus matched BP's `91.62%`.
+Early alignment is `0.999397`; final and epoch-151--200 mean feedback/forward
+cosines are both `0.999663`. The complete trajectory is finite, feedback uses
+zero task-loss queries, and cost remains `1.3261x` BP. This opens MT-1 without
+raising the reviewer score because the result is entirely inherited KP
+evidence.
+
**KP mixed-traffic MT-0 status: mechanics passed; MT-1--MT-3 frozen before
endpoints.** `MIXED_TRAFFIC.md` fixes a four-to-one, initialization-calibrated
soma-predictable traffic intervention and crosses raw apical activity,
@@ -486,7 +494,7 @@ MACs, and every control pays the predictor schedule. The synthetic batch-128
matched path is finite on a GTX 1080 and peaks at 0.857 GB allocated after
reset; no task endpoint was used for this hardware check.
-MT-1 remains sealed until KP-2 passes. A 20-epoch pass opens one full seed-0
+MT-1 is now open after the KP-2 pass. A 20-epoch pass opens one full seed-0
validation panel but cannot raise the reviewer score; a full pass opens the
already frozen five-seed, all-50k, one-test-evaluation confirmation. Only the
complete MT-3 confirmation can move the score from 5/10 to 6/10. This is the