diff options
| author | YurenHao0426 <Blackhao0426@gmail.com> | 2026-07-22 16:31:15 -0500 |
|---|---|---|
| committer | YurenHao0426 <Blackhao0426@gmail.com> | 2026-07-22 16:31:15 -0500 |
| commit | 524c0704029c4b831d9f19413995e8cff1508b8b (patch) | |
| tree | 4df653547478723fa61df58b37af423bc3709583 /ROADMAP.md | |
| parent | f310ad55b76ab96de488cdb4f2d05861ed4616f2 (diff) | |
docs: close mixed-traffic path after short failure
Diffstat (limited to 'ROADMAP.md')
| -rw-r--r-- | ROADMAP.md | 17 |
1 files changed, 9 insertions, 8 deletions
@@ -481,8 +481,8 @@ zero task-loss queries, and cost remains `1.3261x` BP. This opens MT-1 without raising the reviewer score because the result is entirely inherited KP evidence. -**KP mixed-traffic MT-0 status: mechanics passed; MT-1--MT-3 frozen before -endpoints.** `MIXED_TRAFFIC.md` fixes a four-to-one, initialization-calibrated +**KP mixed-traffic status: MT-0 passed; MT-1 failed.** `MIXED_TRAFFIC.md` fixes +a four-to-one, initialization-calibrated soma-predictable traffic intervention and crosses raw apical activity, per-example norm-matched raw activity, and neutral-period innovation on the same reciprocal KP substrate. The zero-traffic limit, exact-predictor limit, @@ -494,12 +494,13 @@ MACs, and every control pays the predictor schedule. The synthetic batch-128 matched path is finite on a GTX 1080 and peaks at 0.857 GB allocated after reset; no task endpoint was used for this hardware check. -MT-1 is now open after the KP-2 pass. A 20-epoch pass opens one full seed-0 -validation panel but cannot raise the reviewer score; a full pass opens the -already frozen five-seed, all-50k, one-test-evaluation confirmation. Only the -complete MT-3 confirmation can move the score from 5/10 to 6/10. This is the -current accept-bar path. It is a controlled predictable-traffic experiment, -not a retroactive rescue of the failed natural/top-down C1 or Oral-B gates. +The complete MT-1 panel then becomes nonfinite in epoch 1 under all three +signals and ends at 10.00% validation accuracy. Calibration error remains only +`4.77e-7`, predictor warmup reaches residual ratio `0.139942`, cost is +`1.3271x` BP, and feedback uses zero task-loss queries, so those mechanical +checks pass while all performance, finite, alignment, and tracking checks +fail. Per the frozen stop rule, MT-2 and MT-3 remain untouched, no weaker +traffic ratio is allowed, and this standard-ResNet accept path closes at 5/10. Prepare convolutional local-update primitives and ResNet-20/32/56 protocols early. Queue frozen runs opportunistically on authorized idle GPUs. Because BurstCCN already reports CIFAR-10 and |
