diff options
Diffstat (limited to 'REVIEW_SCORECARD.md')
| -rw-r--r-- | REVIEW_SCORECARD.md | 1 |
1 files changed, 1 insertions, 0 deletions
diff --git a/REVIEW_SCORECARD.md b/REVIEW_SCORECARD.md index 4257ac3..96272ab 100644 --- a/REVIEW_SCORECARD.md +++ b/REVIEW_SCORECARD.md @@ -77,6 +77,7 @@ Every formal result report records: | Dynamic projection D1 | 5 | All 352 training-only steps remain finite while the fast neutral fit holds residual coupling near zero | Mechanics only; no held-out endpoint | | Dynamic projection D2 | 5 | One frozen 20-epoch record reaches 83.58%, above clean KP's 82.66%, with all stability and cost gates passing | Short single-seed validation cannot establish the full scaling claim | | Dynamic projection D3 | running | A predeclared 200-epoch near-BP validation gate is open | Only a complete pass can make 6/10 eligible and open confirmation | +| Dynamic projection D4 | sealed | Before observing D3, a paired clean-KP/dynamic five-seed test protocol and executable gate were frozen | D3 must pass first; a complete D4 pass, with no seed replacement, is required for 7/10 | | Oral-A A4 | not opened | The prerequisite A3 gate failed | No oral-A confirmation claim is available | These are conditional reviewer forecasts, not promised scores. A failed stage leaves its negative |
