summaryrefslogtreecommitdiff
path: root/results
AgeCommit message (Expand)Author
2026-08-10results: close LMS upfront-calibration screenYurenHao0426
2026-08-10results: aggregate four full state-bias EP seedsYurenHao0426
2026-08-08results: compare full state-bias EP trajectoriesYurenHao0426
2026-08-07results: reject one-epoch affine advantage across seedsYurenHao0426
2026-08-07results: evaluate centered EP under hardware biasYurenHao0426
2026-08-07results: close Rain C0 and released-profile R0YurenHao0426
2026-08-07results: select damaging Dillavou update biasYurenHao0426
2026-08-07results: record weak Dillavou S0 bias screenYurenHao0426
2026-08-06results: validate Rain comparative beta policiesYurenHao0426
2026-08-06results: validate beta-independent Rain biasYurenHao0426
2026-08-06results: reject unmatched random-beta screenYurenHao0426
2026-08-06results: audit Rain EP bias confirmationYurenHao0426
2026-08-06results: validate Rain layer-state mechanismYurenHao0426
2026-08-06results: close Rain parameter-bias screenYurenHao0426
2026-08-06results: confirm Dual Prop bias correctionYurenHao0426
2026-08-06results: test SDIL on measured physical surrogateYurenHao0426
2026-08-06results: identify state-dependent physical driftYurenHao0426
2026-08-06results: reproduce physical structured-bias scalingYurenHao0426
2026-08-06results: close stagewise no-KP feedback screenYurenHao0426
2026-08-06results: close no-KP causal bootstrap screenYurenHao0426
2026-08-06results: close shared-feedback feasibility screenYurenHao0426
2026-08-06results: audit Dual Prop state-bias screenYurenHao0426
2026-08-06results: record contrastive bias mechanics gateYurenHao0426
2026-08-01experiment: freeze ResNet and Transformer selectorsYurenHao0426
2026-07-30figure: add audited plain CNN Pareto frontierYurenHao0426
2026-07-30results: import complete plain CNN crossover auditYurenHao0426
2026-07-27audit: bind depth figure to historical sourceYurenHao0426
2026-07-27figure: audit standard-depth SDIL scalingYurenHao0426
2026-07-27results: record Transformer depth pilotYurenHao0426
2026-07-27analysis: freeze full Transformer registry auditYurenHao0426
2026-07-27analysis: rebind Transformer X0 launch protocolYurenHao0426
2026-07-27analysis: bind Transformer X0 to cost protocolYurenHao0426
2026-07-27analysis: freeze Transformer X0 audit gateYurenHao0426
2026-07-27results: freeze plain CNN P1 selectorYurenHao0426
2026-07-26results: establish KP teaching-signal advantageYurenHao0426
2026-07-26results: confirm standard-depth SDIL scalingYurenHao0426
2026-07-23figures: add audited oral-B-v2 confirmation panelYurenHao0426
2026-07-23results: pass untouched calibrated oral-B-v2 confirmationYurenHao0426
2026-07-23results: pass calibrated oral-B-v2 development gateYurenHao0426
2026-07-23results: retain target-ladder recovery failureYurenHao0426
2026-07-23results: retain failed oral-B-v2 development gridYurenHao0426
2026-07-23paper: add evidence-bound ICLR manuscript draftYurenHao0426
2026-07-23figures: add audited ResNet confirmation panelYurenHao0426
2026-07-23results: retain failed oral B confirmation gateYurenHao0426
2026-07-23results: pass oral B recovery development gateYurenHao0426
2026-07-23results: pass dynamic innovation confirmation gateYurenHao0426
2026-07-22results: pass full dynamic projection gateYurenHao0426
2026-07-22docs: add audited dynamic stability captionYurenHao0426
2026-07-22figure: visualize dynamic innovation stability repairYurenHao0426
2026-07-22results: pass dynamic projection short validationYurenHao0426