summaryrefslogtreecommitdiff
path: root/results
AgeCommit message (Expand)Author
2026-08-06results: audit Dual Prop state-bias screenYurenHao0426
2026-08-06results: record contrastive bias mechanics gateYurenHao0426
2026-08-01experiment: freeze ResNet and Transformer selectorsYurenHao0426
2026-07-30figure: add audited plain CNN Pareto frontierYurenHao0426
2026-07-30results: import complete plain CNN crossover auditYurenHao0426
2026-07-27audit: bind depth figure to historical sourceYurenHao0426
2026-07-27figure: audit standard-depth SDIL scalingYurenHao0426
2026-07-27results: record Transformer depth pilotYurenHao0426
2026-07-27analysis: freeze full Transformer registry auditYurenHao0426
2026-07-27analysis: rebind Transformer X0 launch protocolYurenHao0426
2026-07-27analysis: bind Transformer X0 to cost protocolYurenHao0426
2026-07-27analysis: freeze Transformer X0 audit gateYurenHao0426
2026-07-27results: freeze plain CNN P1 selectorYurenHao0426
2026-07-26results: establish KP teaching-signal advantageYurenHao0426
2026-07-26results: confirm standard-depth SDIL scalingYurenHao0426
2026-07-23figures: add audited oral-B-v2 confirmation panelYurenHao0426
2026-07-23results: pass untouched calibrated oral-B-v2 confirmationYurenHao0426
2026-07-23results: pass calibrated oral-B-v2 development gateYurenHao0426
2026-07-23results: retain target-ladder recovery failureYurenHao0426
2026-07-23results: retain failed oral-B-v2 development gridYurenHao0426
2026-07-23paper: add evidence-bound ICLR manuscript draftYurenHao0426
2026-07-23figures: add audited ResNet confirmation panelYurenHao0426
2026-07-23results: retain failed oral B confirmation gateYurenHao0426
2026-07-23results: pass oral B recovery development gateYurenHao0426
2026-07-23results: pass dynamic innovation confirmation gateYurenHao0426
2026-07-22results: pass full dynamic projection gateYurenHao0426
2026-07-22docs: add audited dynamic stability captionYurenHao0426
2026-07-22figure: visualize dynamic innovation stability repairYurenHao0426
2026-07-22results: pass dynamic projection short validationYurenHao0426
2026-07-22results: pass dynamic projection training gateYurenHao0426
2026-07-22results: close stability-margin training screenYurenHao0426
2026-07-22diagnostic: record pre-grid stability candidatesYurenHao0426
2026-07-22diagnostic: record mixed-traffic failure onsetYurenHao0426
2026-07-22results: record mixed-traffic short failureYurenHao0426
2026-07-22results: pass reciprocal KP full gateYurenHao0426
2026-07-22audit: manifest tracking failure figure sourcesYurenHao0426
2026-07-22figure: visualize endpoint tracking failureYurenHao0426
2026-07-22results: pass mixed-traffic mechanics gateYurenHao0426
2026-07-22results: record residual mirror full failureYurenHao0426
2026-07-22results: pass reciprocal KP short gateYurenHao0426
2026-07-22results: pass residual mirror short gateYurenHao0426
2026-07-22results: pass residual mirror capture gateYurenHao0426
2026-07-22results: close normalized mirror short accuracy gateYurenHao0426
2026-07-22results: pass normalized mirror causal-capture gateYurenHao0426
2026-07-22results: close hierarchical task-scalar calibration gateYurenHao0426
2026-07-22results: close fixed hierarchical FA short gateYurenHao0426
2026-07-22analysis: identify hierarchical spatial credit bottleneckYurenHao0426
2026-07-22results: close Oral-A v3 causal-capture gateYurenHao0426
2026-07-22analysis: localize early-layer feedback bottlenecksYurenHao0426
2026-07-22results: close Oral-A v2 causal-capture gateYurenHao0426