index
:
sdil.git
a6000-x1-results
main
Unnamed repository; edit this file 'description' to name the repository.
Ubuntu
summary
refs
log
tree
commit
diff
log msg
author
committer
range
path:
root
/
results
Age
Commit message (
Expand
)
Author
2026-08-10
results: close LMS upfront-calibration screen
YurenHao0426
2026-08-10
results: aggregate four full state-bias EP seeds
YurenHao0426
2026-08-08
results: compare full state-bias EP trajectories
YurenHao0426
2026-08-07
results: reject one-epoch affine advantage across seeds
YurenHao0426
2026-08-07
results: evaluate centered EP under hardware bias
YurenHao0426
2026-08-07
results: close Rain C0 and released-profile R0
YurenHao0426
2026-08-07
results: select damaging Dillavou update bias
YurenHao0426
2026-08-07
results: record weak Dillavou S0 bias screen
YurenHao0426
2026-08-06
results: validate Rain comparative beta policies
YurenHao0426
2026-08-06
results: validate beta-independent Rain bias
YurenHao0426
2026-08-06
results: reject unmatched random-beta screen
YurenHao0426
2026-08-06
results: audit Rain EP bias confirmation
YurenHao0426
2026-08-06
results: validate Rain layer-state mechanism
YurenHao0426
2026-08-06
results: close Rain parameter-bias screen
YurenHao0426
2026-08-06
results: confirm Dual Prop bias correction
YurenHao0426
2026-08-06
results: test SDIL on measured physical surrogate
YurenHao0426
2026-08-06
results: identify state-dependent physical drift
YurenHao0426
2026-08-06
results: reproduce physical structured-bias scaling
YurenHao0426
2026-08-06
results: close stagewise no-KP feedback screen
YurenHao0426
2026-08-06
results: close no-KP causal bootstrap screen
YurenHao0426
2026-08-06
results: close shared-feedback feasibility screen
YurenHao0426
2026-08-06
results: audit Dual Prop state-bias screen
YurenHao0426
2026-08-06
results: record contrastive bias mechanics gate
YurenHao0426
2026-08-01
experiment: freeze ResNet and Transformer selectors
YurenHao0426
2026-07-30
figure: add audited plain CNN Pareto frontier
YurenHao0426
2026-07-30
results: import complete plain CNN crossover audit
YurenHao0426
2026-07-27
audit: bind depth figure to historical source
YurenHao0426
2026-07-27
figure: audit standard-depth SDIL scaling
YurenHao0426
2026-07-27
results: record Transformer depth pilot
YurenHao0426
2026-07-27
analysis: freeze full Transformer registry audit
YurenHao0426
2026-07-27
analysis: rebind Transformer X0 launch protocol
YurenHao0426
2026-07-27
analysis: bind Transformer X0 to cost protocol
YurenHao0426
2026-07-27
analysis: freeze Transformer X0 audit gate
YurenHao0426
2026-07-27
results: freeze plain CNN P1 selector
YurenHao0426
2026-07-26
results: establish KP teaching-signal advantage
YurenHao0426
2026-07-26
results: confirm standard-depth SDIL scaling
YurenHao0426
2026-07-23
figures: add audited oral-B-v2 confirmation panel
YurenHao0426
2026-07-23
results: pass untouched calibrated oral-B-v2 confirmation
YurenHao0426
2026-07-23
results: pass calibrated oral-B-v2 development gate
YurenHao0426
2026-07-23
results: retain target-ladder recovery failure
YurenHao0426
2026-07-23
results: retain failed oral-B-v2 development grid
YurenHao0426
2026-07-23
paper: add evidence-bound ICLR manuscript draft
YurenHao0426
2026-07-23
figures: add audited ResNet confirmation panel
YurenHao0426
2026-07-23
results: retain failed oral B confirmation gate
YurenHao0426
2026-07-23
results: pass oral B recovery development gate
YurenHao0426
2026-07-23
results: pass dynamic innovation confirmation gate
YurenHao0426
2026-07-22
results: pass full dynamic projection gate
YurenHao0426
2026-07-22
docs: add audited dynamic stability caption
YurenHao0426
2026-07-22
figure: visualize dynamic innovation stability repair
YurenHao0426
2026-07-22
results: pass dynamic projection short validation
YurenHao0426
[next]