index
:
sdil.git
main
Unnamed repository; edit this file 'description' to name the repository.
Ubuntu
summary
refs
log
tree
commit
diff
log msg
author
committer
range
path:
root
/
results
Age
Commit message (
Collapse
)
Author
26 hours
figure: add audited plain CNN Pareto frontier
YurenHao0426
26 hours
results: import complete plain CNN crossover audit
YurenHao0426
4 days
audit: bind depth figure to historical source
YurenHao0426
4 days
figure: audit standard-depth SDIL scaling
YurenHao0426
4 days
results: record Transformer depth pilot
YurenHao0426
4 days
analysis: freeze full Transformer registry audit
YurenHao0426
4 days
analysis: rebind Transformer X0 launch protocol
YurenHao0426
4 days
analysis: bind Transformer X0 to cost protocol
YurenHao0426
4 days
analysis: freeze Transformer X0 audit gate
YurenHao0426
4 days
results: freeze plain CNN P1 selector
YurenHao0426
5 days
results: establish KP teaching-signal advantage
YurenHao0426
5 days
results: confirm standard-depth SDIL scaling
YurenHao0426
8 days
figures: add audited oral-B-v2 confirmation panel
YurenHao0426
8 days
results: pass untouched calibrated oral-B-v2 confirmation
YurenHao0426
8 days
results: pass calibrated oral-B-v2 development gate
YurenHao0426
8 days
results: retain target-ladder recovery failure
YurenHao0426
8 days
results: retain failed oral-B-v2 development grid
YurenHao0426
8 days
paper: add evidence-bound ICLR manuscript draft
YurenHao0426
8 days
figures: add audited ResNet confirmation panel
YurenHao0426
8 days
results: retain failed oral B confirmation gate
YurenHao0426
8 days
results: pass oral B recovery development gate
YurenHao0426
8 days
results: pass dynamic innovation confirmation gate
YurenHao0426
9 days
results: pass full dynamic projection gate
YurenHao0426
9 days
docs: add audited dynamic stability caption
YurenHao0426
9 days
figure: visualize dynamic innovation stability repair
YurenHao0426
9 days
results: pass dynamic projection short validation
YurenHao0426
9 days
results: pass dynamic projection training gate
YurenHao0426
9 days
results: close stability-margin training screen
YurenHao0426
9 days
diagnostic: record pre-grid stability candidates
YurenHao0426
9 days
diagnostic: record mixed-traffic failure onset
YurenHao0426
9 days
results: record mixed-traffic short failure
YurenHao0426
9 days
results: pass reciprocal KP full gate
YurenHao0426
9 days
audit: manifest tracking failure figure sources
YurenHao0426
9 days
figure: visualize endpoint tracking failure
YurenHao0426
9 days
results: pass mixed-traffic mechanics gate
YurenHao0426
9 days
results: record residual mirror full failure
YurenHao0426
9 days
results: pass reciprocal KP short gate
YurenHao0426
9 days
results: pass residual mirror short gate
YurenHao0426
9 days
results: pass residual mirror capture gate
YurenHao0426
9 days
results: close normalized mirror short accuracy gate
YurenHao0426
9 days
results: pass normalized mirror causal-capture gate
YurenHao0426
9 days
results: close hierarchical task-scalar calibration gate
YurenHao0426
9 days
results: close fixed hierarchical FA short gate
YurenHao0426
9 days
analysis: identify hierarchical spatial credit bottleneck
YurenHao0426
9 days
results: close Oral-A v3 causal-capture gate
YurenHao0426
9 days
analysis: localize early-layer feedback bottlenecks
YurenHao0426
9 days
results: close Oral-A v2 causal-capture gate
YurenHao0426
9 days
analysis: diagnose Oral-A calibration failure
YurenHao0426
9 days
baselines: complete native author-code audit
YurenHao0426
9 days
results: record failed Oral-A full ResNet gate
YurenHao0426
[next]