summaryrefslogtreecommitdiff
path: root/RESULTS.md
AgeCommit message (Collapse)Author
2026-08-06results: close shared-feedback feasibility screenYurenHao0426
2026-07-27docs: align project status with depth passYurenHao0426
2026-07-23figures: add audited ResNet confirmation panelYurenHao0426
2026-07-23docs: record oral B recovery boundaryYurenHao0426
2026-07-23docs: record accept-gate confirmation passYurenHao0426
2026-07-22docs: promote full dynamic ResNet resultYurenHao0426
2026-07-22docs: record dynamic projection stability and short passYurenHao0426
2026-07-22docs: close one-sided stability branchYurenHao0426
2026-07-22docs: explain mixed-traffic instabilityYurenHao0426
2026-07-22docs: close mixed-traffic path after short failureYurenHao0426
2026-07-22docs: record reciprocal KP full passYurenHao0426
2026-07-22figure: visualize endpoint tracking failureYurenHao0426
2026-07-22results: record residual mirror full failureYurenHao0426
2026-07-22results: pass reciprocal KP short gateYurenHao0426
2026-07-22results: pass residual mirror short gateYurenHao0426
2026-07-22results: pass residual mirror capture gateYurenHao0426
2026-07-22results: close normalized mirror short accuracy gateYurenHao0426
2026-07-22results: pass normalized mirror causal-capture gateYurenHao0426
2026-07-22results: close hierarchical task-scalar calibration gateYurenHao0426
2026-07-22results: close fixed hierarchical FA short gateYurenHao0426
2026-07-22analysis: identify hierarchical spatial credit bottleneckYurenHao0426
2026-07-22results: close Oral-A v3 causal-capture gateYurenHao0426
2026-07-22analysis: localize early-layer feedback bottlenecksYurenHao0426
2026-07-22results: close Oral-A v2 causal-capture gateYurenHao0426
2026-07-22analysis: diagnose Oral-A calibration failureYurenHao0426
2026-07-22baselines: complete native author-code auditYurenHao0426
2026-07-22results: record failed Oral-A full ResNet gateYurenHao0426
2026-07-22docs: name the retention test preciselyYurenHao0426
2026-07-22analysis: test the frozen depth-retention marginYurenHao0426
2026-07-22results: audit innovation figure statisticsYurenHao0426
2026-07-22results: close oral B signature screenYurenHao0426
2026-07-22results: close normalized C2 recoveryYurenHao0426
2026-07-22theory: prove estimator and innovation regimesYurenHao0426
2026-07-22results: close feedback-first C2 recoveryYurenHao0426
2026-07-22results: close calibration quality recoveryYurenHao0426
2026-07-22results: confirm C2 feedback amortization bottleneckYurenHao0426
2026-07-22results: close context-vectorizer C2 recoveryYurenHao0426
2026-07-22results: close failed C2 local panelYurenHao0426
2026-07-22results: mark useful-depth BP screen passedYurenHao0426
2026-07-22results: close failed C1 recovery branchYurenHao0426
2026-07-22results: record frozen C1 near-missYurenHao0426
2026-07-22results: mark amortized calibration gate passedYurenHao0426
2026-07-22results: freeze single-direction calibrationYurenHao0426
2026-07-22results: freeze predictor timescale choiceYurenHao0426
2026-07-22docs: correct SDIL novelty boundaryYurenHao0426
2026-07-22docs: report final audited scaling and EP resultsYurenHao0426
2026-07-21experiments: add exact shallow EP comparison sweepYurenHao0426
2026-07-21docs: report audited baseline comparisonsYurenHao0426
2026-07-21results: record corrected scaling and residualization pilotsYurenHao0426
2026-07-21chore: capture initial SDIL project stateYurenHao0426