summaryrefslogtreecommitdiff
path: root/RESULTS.md
AgeCommit message (Collapse)Author
4 daysdocs: align project status with depth passYurenHao0426
8 daysfigures: add audited ResNet confirmation panelYurenHao0426
8 daysdocs: record oral B recovery boundaryYurenHao0426
8 daysdocs: record accept-gate confirmation passYurenHao0426
9 daysdocs: promote full dynamic ResNet resultYurenHao0426
9 daysdocs: record dynamic projection stability and short passYurenHao0426
9 daysdocs: close one-sided stability branchYurenHao0426
9 daysdocs: explain mixed-traffic instabilityYurenHao0426
9 daysdocs: close mixed-traffic path after short failureYurenHao0426
9 daysdocs: record reciprocal KP full passYurenHao0426
9 daysfigure: visualize endpoint tracking failureYurenHao0426
9 daysresults: record residual mirror full failureYurenHao0426
9 daysresults: pass reciprocal KP short gateYurenHao0426
9 daysresults: pass residual mirror short gateYurenHao0426
9 daysresults: pass residual mirror capture gateYurenHao0426
9 daysresults: close normalized mirror short accuracy gateYurenHao0426
9 daysresults: pass normalized mirror causal-capture gateYurenHao0426
9 daysresults: close hierarchical task-scalar calibration gateYurenHao0426
9 daysresults: close fixed hierarchical FA short gateYurenHao0426
9 daysanalysis: identify hierarchical spatial credit bottleneckYurenHao0426
9 daysresults: close Oral-A v3 causal-capture gateYurenHao0426
9 daysanalysis: localize early-layer feedback bottlenecksYurenHao0426
9 daysresults: close Oral-A v2 causal-capture gateYurenHao0426
9 daysanalysis: diagnose Oral-A calibration failureYurenHao0426
9 daysbaselines: complete native author-code auditYurenHao0426
9 daysresults: record failed Oral-A full ResNet gateYurenHao0426
9 daysdocs: name the retention test preciselyYurenHao0426
9 daysanalysis: test the frozen depth-retention marginYurenHao0426
9 daysresults: audit innovation figure statisticsYurenHao0426
10 daysresults: close oral B signature screenYurenHao0426
10 daysresults: close normalized C2 recoveryYurenHao0426
10 daystheory: prove estimator and innovation regimesYurenHao0426
10 daysresults: close feedback-first C2 recoveryYurenHao0426
10 daysresults: close calibration quality recoveryYurenHao0426
10 daysresults: confirm C2 feedback amortization bottleneckYurenHao0426
10 daysresults: close context-vectorizer C2 recoveryYurenHao0426
10 daysresults: close failed C2 local panelYurenHao0426
10 daysresults: mark useful-depth BP screen passedYurenHao0426
10 daysresults: close failed C1 recovery branchYurenHao0426
10 daysresults: record frozen C1 near-missYurenHao0426
10 daysresults: mark amortized calibration gate passedYurenHao0426
10 daysresults: freeze single-direction calibrationYurenHao0426
10 daysresults: freeze predictor timescale choiceYurenHao0426
10 daysdocs: correct SDIL novelty boundaryYurenHao0426
10 daysdocs: report final audited scaling and EP resultsYurenHao0426
10 daysexperiments: add exact shallow EP comparison sweepYurenHao0426
10 daysdocs: report audited baseline comparisonsYurenHao0426
10 daysresults: record corrected scaling and residualization pilotsYurenHao0426
10 dayschore: capture initial SDIL project stateYurenHao0426